update seis act
This commit is contained in:
		@@ -21,12 +21,10 @@ Step 1. Prepare Tape: Measure and cut approximately 10mm of tape. The tape will
 | 
			
		||||
 | 
			
		||||

 | 
			
		||||
 | 
			
		||||
 | 
			
		||||
Step 2. Fasten Tape: Fasten tape to the micro USB cable and to the plate. Attach the micro:bit to the micro:bit USB. 
 | 
			
		||||
 | 
			
		||||

 | 
			
		||||
 | 
			
		||||
 | 
			
		||||
### ~avatar avatar
 | 
			
		||||
 | 
			
		||||
Seismograph built, let's code! 
 | 
			
		||||
@@ -38,7 +36,6 @@ Step 1. Go to Codemicrobit.com
 | 
			
		||||
    Click or tap New Project
 | 
			
		||||
    Click or tap Blocks
 | 
			
		||||
    
 | 
			
		||||
 | 
			
		||||
Step 2. 
 | 
			
		||||
 | 
			
		||||
We will measure `acceleration (mg)` in terms of strength or Magnitude. Get the acceleration value (milli g-force), as measured in strength or Magnitude.
 | 
			
		||||
@@ -47,10 +44,9 @@ We will measure `acceleration (mg)` in terms of strength or Magnitude. Get the a
 | 
			
		||||
input.acceleration(Dimension.Strength);
 | 
			
		||||
```
 | 
			
		||||
 | 
			
		||||
 | 
			
		||||
Step 3. 
 | 
			
		||||
 | 
			
		||||
Use the plot bar chart to visualize the acceleration on the LED screen of the micro:bit in the specified range. You implement plot Bar Graph to display a vertical bar graph based on the "value" and "high" value. Then you must insert acceleration in based on strength. 
 | 
			
		||||
Use the plot bar chart to visualize the acceleration on the LED screen of the micro:bit in the specified range. You implement forever and plot Bar Graph to constantly display a vertical bar graph, which will be based on the "value" and "high" value. Then measure the acceleration based on the strength or Magnitude. 
 | 
			
		||||
 | 
			
		||||
```blocks
 | 
			
		||||
basic.forever(() => {
 | 
			
		||||
 
 | 
			
		||||
		Reference in New Issue
	
	Block a user